Revised Norms for operational Activities at ICSH/CRC

Ref: No. WB/59                                                                                                                    Date: 26.12.2013

To,
Com. Giriraj Singh,
General Secretary,
AIRMS&MMS EU, Gr.- ‘C’,
CHQ, New Delhi.

                Sub: Work study in c/w Revised Norms for operational Activities at ICSH/CRC.
                Ref: Dte. memo no. 28-8/2011-D dt. 17-01-2013 & dt. 13-08-2013.

Comrade,
                We have discussed at length at our Circle level regarding the norms after receiving the work study report from the Department and we suggested the revised norms and request you to take up the case at the Dte.
Item no.
Item of Work
Dte.’s time factor (In minutes)
Proposed time factor (in minutes)
Note
1.
Switching on and opening of Computer by User.
2.00
2.00
Justified
2.
Receipt of bag
0.17
0.25
As experienced after work study.
3.
Examination & Opening of bags
0.5
1.11
Receiving from Supervisor 0.16 minutes as per MTT + Bag received + Bag checking by label scanning & followed by opening.
4.
Examination of Articles received
0.11
0.11
Justified
5.
Scanning of Article in receipt
0.04 (25 Articles per minutes)
15 Articles per Minute
If the machineries well functioned, then only 900 articles/ Hour is permissible.
6.
Sorting of Articles
0.079 (760 articles per Hour)
700 Articles per hour
If Service condition like as amenities/ peripherals provided properly.
7.
Scanning of Article in despatch
0.04 (25 Articles per minutes)
15 Articles per Minute
If the machineries well functioned, then only 900 articles/ Hour is permissible.
8.
Generation of list
0.40
0.50
As experienced after work study.
9.
Closing of bags
1.00
1.25
As per MTT
10.
Preparation of Mail List
0.20
0.50
As experienced after work study.
11.
Opening/ Examination/ Sorting and preparation of bundles
0.15
0.50 to 5.00
It depends on the respective offices and number of articles of the respective bundles.
12.
(i) Despatch of Mails, (ii) Receipt of bag from Sorter, (iii) Preparation of TBs & (iv) Despatch of Mail
1 minutes per Bag
1 minutes per Bag
Justified
13.
Misc. Work/ irregularities
10% of total work Hours
10% of total work Hours
Justified
14.
Clicking shift end and switching off Computer
1.33
2.00
As experienced after work study.
15.
Supervisor
1 on 6 SAs/RSAs.
1 on 6 SAs/RSAs.
Justified/ On less than 6 RSAs coefficient of 1.20 hrs is required to be given on each SA/ RSA.
The following items to be incorporated in the Norms
16.
Opening/ Closing of SP TBs/ RTBs
Not Shown
8 Minutes per TB
As per MTT
17.
Rest Hours
Not Shown
4 minutes per Hour
As the official engaged in Computer functioning, so to reduce the pressure upon the eye ball the rest is required.
18.
Tiffin Hours
Not Shown
30 minutes
Per eight hours of Duty
19.
Cut off time
Not Shown
1.5 to 2 hrs before closing of the Set
As per Norms
                                                                                                             (S.K. Bardhan)

                                                                                                            Circle Secretary

Circle Union Wrote regarding Manning of TVP Sections in West Bengal Circle

Ref No.: WB/38                                                                                                Date: 26.12.2013.

To,
Sri J. Panda,
Chief Post Master General,
West Bengal Circle,
Yogayog Bhavan,
Kolkata- 700012.

                        Sub: Manning of TVP Sections in West Bengal Circle.

Respected Sir,
            Kindly recall our discussion had with you on 23/12/2013 regarding the functioning of TVP Sections as started/ initiated by the Circle authority since September, 2013. The matter was brought to your kind notice that without taking approval from the Railway Authority Department started the functioning of TVP.
            So far report received by the Circle Union that the TVP are carrying a good number of Bags causes a misunderstanding with the passenger travelling in the same compartment. While travelling by train purchasing daily ticket/ Session ticket there is a norms prescribed by the Railway Authority for carrying of articles. But, the employees are compelled to carry the Mails more than the specified weight as prescribed by the railway authority.
            If you kindly remember at the time of discussion it was mentioned that for quicker disposal of Speed Post article and Registered articles- the functioning of TVP is essential on the part of Department. The views of the Department cannot be denied by us, but without maintaining any formalities it was introduced hurriedly. So under these circumstances we earnestly request you to take the necessary steps-
1)    Necessary permission of the Railway Authority are required immediately for the safety and security of the staff as well as the public Mails.
2)    Necessary orders are required for carrying of Mails up to the weight limit prescribed by the Railway Authority to avoid the harassment of the Staff.
Considering the entire situation and gravity of the above said issue we request you for issuing necessary instruction immediately for smooth functioning of the TVP.
A line of reply as action taken is highly solicited.
            Thanking you, 
Yours faithfully,

 (S.K. Bardhan)
   Circle Secretary


Minutes of the JCM, Departmental Council (DC) Meeting held on 27/11/2013

Tuesday 3 December 2013

SEMINAR AND STUDY CAMP
Seminar on Modernization in Postal Department & Postal Services and Study Camp was organized by RMS `SG` Division and Circle Union R-III at Siliguri on 1st  December, 2013 under the Presidentship of Com. Soumen Roy, Dhusar kanti Dey & Bhola Bhattacharya.
Shri L. Pradhan PMG (NB & Sikkim Region) inaugurated the Seminar and elaborately spoke on Modernization in Postal Department & Postal Services.
Com. R.N.Parashar, ASG NFPE took a class on the subject on “ History of Postal Trade Union Movement and task ahead”. Com. Giri Raj Singh  G/S R-III took class on the subject on “Present Development in Postal Department particularly in RMS & MMS”
After lunch at 02.00PM on 1-12-2013 Com. K.K.N. Kutty, President, Confederation took class on the subject on “ Central Government Employees Movement & Role of NFPE “
Com. S.K. Bardhan President, R-IIICHQ & C/S addressed the Study Camp.
Com. Soumen Roy Circle President gave vote of thanks.